zum Hauptmenü zum Seiteninhalt zur Subnavigation zum Footermenü zur Suchfunktion zu den Hinweisen der Barrierefreiheit


From October 30 to November 7: Full closure of Fellbacher Straße in Remseck-Neckarrems due to road renewal

In order to repair serious road damage, the state is making 300,000 euros available to the road builders of the district administration for renovation work. These funds will be used to repair the road surface of Fellbacher Straße (L 1197) in Neckarrems from October 30 to November 7. During the construction work, Fellbacher Straße will have to be fully closed.

A view of a curved road surrounded by greenery. On the right, there are trees and bushes, while buildings are visible on the left. A road sign indicating caution is present, but the specific warning is not discernible. The sky is clear with a few clouds.

During the first construction phase, the section between the intersection of Fellbacher Straße / Remstalstraße and the access road "Am unteren Schloßberg" in Neckarrems will be closed from Friday, October 30, from 6 p.m. until Monday, November 2, at 5:30 a.m. inclusive. During this time, the Schloßberg residential area can only be reached via the municipal road in the direction of Oeffingen.

The second construction phase after the Am unteren Schloßberg access road and Brückenstraße (access to the Aldingen industrial area) will begin on Monday, November 2, at 5:30 a.m. and end on Saturday, November 7. During the second construction phase, the Schloßberg residential area will once again be accessible via Fellbacher Straße (L 1197) from the town center.

Local traffic will be diverted in both directions via the L 1142 to Hegnach and the K 1854 and will be signposted. The "Am Schloßberg" bus stop will be closed during the construction period.

The district administration office asks all passengers, residents and road users for their understanding for possible traffic obstructions, especially in the detour area.