To repair road damage, the Ludwigsburg road maintenance department will be carrying out repairs in the area of the "Autokino" junction in the direction of Stuttgart during the first three days of December. From December 1 to 3, damage to the road surface will be repaired at short notice on a 70-metre section. On December 1, the entire width of the carriageway will be milled off and traffic will be able to drive over the milled area at reduced speed. On December 2, one of the two lanes will be asphalted and left to cool overnight. On December 3, the second lane is asphalted. On the evening of December 3, the entire lane is reopened to traffic. During the work, all lanes will remain open while the existing carriageway is narrowed. The cost of the investment in the infrastructure is 10,000 euros and will be covered by the federal government. The work will be carried out as quickly as possible. The district administration office asks for your understanding for the resulting traffic disruptions.